This section provides information about the new symbols which are available to you as of Version 2.8 in the master data.
Notes:
- The following pages show a number of illustrations of new symbols from different symbol libraries. The illustrations show variant "A" of the respective symbols in multi-line or single-line representation. The name and number of the symbol are shown underneath the symbol.
- Several symbols dispose of the same symbol graphic. These symbols do, however, differ with regard to usage in the trades, the function definitions, the symbol properties and their positions. New symbols that have the same symbol graphic are displayed together.
IEC, GOST, and GB standards
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NFPA standard
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fluid power
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MSR_03 // 363 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Also the following symbols have been blocked in the symbol library "
ANT_02 // 122
ANT_06 // 126
ANT_07 // 127
ANT_08 // 128
FP_11 // 141.
|
|
|
|
Process engineering and building automation
The "
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Special symbol library
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A new NFPA-compatible symbol for interruption points has been added to the "
|
|
|
|
In addition corrections were made in the symbol library "
- The PID2PNG // 291 symbol with two container connection points for the process engineering was replaced with the new symbol PID2PNG_1 // 298 with the corrected symbol graphic.
- In the following symbols for structure segments and planning objects in the graphical pre-planning the property arrangements have been adapted in such a way that possible cross-references in the pre-planning are displayed directly:
SCSS // 270
SCSS2 // 271
DCPLO // 280
DCPLO2 // 281.