Dialog Settings: Symbol scheme (Changing Standards)

This dialog lists all previous cross-project and user-defined assignment schemes of source project symbols to target project symbols. You can delete any assignment schemes that are no longer needed. If you use an assignment scheme for the change of standard, the source project symbols are replaced by the target project symbols.

Overview of the main dialog elements:

Toolbar:

Button

Meaning

(Delete)

Deletes a selected row. The deleted assignment is then no longer available in any project.

Assign symbols:

Every row contains an assignment of source library symbols to target library symbols.

  • Source: Symbol library: Displays the file name of the source project symbol library without a file extension.
  • Target: Symbol library: Displays the file name of the target project symbol library without a file extension.
  • Scheme: This drop-down list displays all the previously specified assignment schemes for assigning symbols. The schemes selected here are transferred to the project.
  • Status: If a scheme is selected in the Scheme column, the assignment of the symbols is checked. This column displays the status of the check. The status is "OK" if the function definitions for the symbols match and the number of source symbol connection points are less or equal to the number of target symbol connection points.

Popup menu:

The popup menu provides - depending on the field type (e.g. date, integer, multilingual) - the following menu items that are, depending on the situation, available for influencing the table or editing the values in the fields. You can find an overview of these popup menu items in the section Popup menu items.