Setting up the Target Project (Changing Standards)

When changing standards, a source project is transformed. The transformed source project is saved in a target project. The source project remains unchanged.

Note:

Please note that only those objects that are within the reporting range of the plot frame (thus the range defined by the rows and columns) are copied to the target project.

Preconditions:

  • You have opened a project.
  • In the case of several opened projects: You have selected a project in the page navigator.
  • You have a basic project containing country- or standards-specific settings.
  1. Select the following commands: Tab Tools > Command group Standards > Exchange.
  2. Specify a recognizable project name without file name extension in the Target project name field of the Project tab.
  3. Click next to the Storage location field to select a storage location for the project.
  4. In the Select folder dialog select the directory where you want to save the new project and click [OK].
  5. Click [Next].

    Basic Project and Defining Rotation / Flipping

See also